after you’ve concluded the flushing and run the engine from gas, switch off the vital and also the battery swap. This flushing process ought to get a complete of about 5 to 10 minutes. Wipe every little thing down and spray with a corrosion inhibitor. Lubricate each of the moving parts including the change and throttle cables, carburetor linkage